BestWatt 80: nacelle replacement on an existing tower
In Northern Ireland, Farming and Furniture upgraded their wind energy system with the BestWatt 80. Instead of costly refurbishments, they opted to install a BestWatt Nacelle on their existing tower—ensuring higher efficiency, lower noise, and a seamless integration into their grid export setup.
back to project overviewCustom Engineering for a Perfect Fit
Rengineers designed a custom adapter plate to fit the BW80 onto the old Endurance tower. The result? A cost-effective, high-performance upgrade backed by a 25-year warranty.
“The turbine runs flawlessly, and BestWatt gives us peace of mind,” says the owner.
Ready to upgrade? Discover the BW80 advantage with BestWatt!

