BestWatt 80: nacelle replacement on an existing tower

In Northern Ireland, Farming and Furniture upgraded their wind energy system with the BestWatt 80. Instead of costly refurbishments, they opted to install a BestWatt Nacelle on their existing tower—ensuring higher efficiency, lower noise, and a seamless integration into their grid export setup.

back to project overview

Custom Engineering for a Perfect Fit
Rengineers designed a custom adapter plate to fit the BW80 onto the old Endurance tower. The result? A cost-effective, high-performance upgrade backed by a 25-year warranty.

 

“The turbine runs flawlessly, and BestWatt gives us peace of mind,” says the owner.

 

Ready to upgrade? Discover the BW80 advantage with BestWatt!